Helsingin kaupunki, Rakennusvirasto, Rakennusvirasto

Multiple venues (2 pcs)

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
Inspected: 24.02.2016
Next inspection: 24.02.2019
Inspected: 24.02.2016
Next inspection: 24.02.2019
Helsingin kaupunki, Rakennusvirasto / Rakennusvirasto
Elimäenkatu 5
00510 Helsinki
Venue type: Auditorium
Venue URL: http://www.hkr.hel.fi
Information provided by: Qlu Oy
In cooperation with:
Helsingin kaupunki, Rakennusvirasto
Elimäenkatu 5
00510 Helsinki
Helsingin kaupunki, Rakennusvirasto
Elimäenkatu 5
00510 Helsinki