Tampere-talo

Multiple venues (9 pcs)

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Inspected: 02.08.2018
Next inspection: 06.08.2021
Tampere-talo
Yliopistonkatu 55
33100 Tampere
Venue type: Hall
Venue URL: https://tampere-talo.fi
Information provided by: Laatukuuluu Oy
In cooperation with:
Tampere-talo Oy
Yliopistonkatu 55
33101 Tampere
Tampere-talo Oy
Yliopistonkatu 55
33101 Tampere
Tampere-talo Oy
Yliopistonkatu 55
33101 Tampere
Tampere-talo
Yliopistonkatu 55
33100 Tampere
Tampere-talo
Yliopistonkatu 55
33100 Tampere
Tampere-talo
Yliopistonkatu 55
33100 Tampere
Tampere-talo
Yliopistonkatu 55
33100 Tampere