Pääkirjasto Metso

Multiple venues (15 pcs)

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard.

The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
The operation of the induction loop has been tested according IEC60118-4:2014 standard and the quality-map is published.
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
  • Excellent hearing experience Excellent hearing experience
  • Good hearing experience Good hearing experience
  • Poor hearing experience Poor hearing experience
  • Interference Interference
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 23.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 23.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 23.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Inspected: 23.07.2019
Next inspection: 24.07.2022
Pääkirjasto Metso
Pirkankatu 2
33210 Tampere
Venue type: Conference room
Venue URL: https://www.tampere.fi/kulttuuri-ja-vapaa-aika/kirjastot/aukiolot-ja-yhteystiedot/paakirjasto-metso.html
Information provided by: Qlu Oy
In cooperation with:
Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki

Tampereen kaupunki
Tampereen kaupunki